视色午夜在线精品一区二区-国产成人无码AV一区二区在线观看-内射丰满高大五十五岁熟女-国产99久久久国产精品~~牛
Hot air gun manufacturer

Contact

Shenzhen de Hi Tech Co., Ltd.

Contact: Mr. Chen

Telephone: 0755-27872999

Fax: 0755-22636863

URL: wygtwh.com

Address: Shenzhen City, Baoan District Xin'an Yang Tian72 District Luther to high-tech park 11


Your current location: Home >> Product >> Hot air gun

Two stage hot air gun

Two stage hot air gun

  • Product Image
  • Specifications
  • Features
  • Instructions for use

   Industrial hot air gun

Model parameterHG6618HG6617
Voltage220V/50Hz220V/50Hz
Power1600W1600W
Temperature50~400/550°C400/550°C
Gas flowL:250L/H:400LL:250L/H:400L
Display//
temperature controlElectronic thermoregulation/
Temperature regulation methodRear cover knobTwo stalls hot air
Speed regulation modeTwo speed switch control
Cold wind//
Electric machineryTaiwan 385 motorsMade in China 385 motors
Heating coreThree wire long life heating core
Power cordTwo inserted GB power line (1.6m)
Temperature protectionHigh temperature protection
Placement modeDouble functions of hook and handstand support
Weight675g615g
Product number650.05.155650.05.346



image.png










The use of tools, please familiarize yourself with the method of operation and safety


Applicable temperature suggestion

Thaw the frozen tube at 50-150 degrees centigrade

205-230 C, plastic bending or dry paint or soft grinding

Softening adhesion at 230-290

Softening welding material at 425-455 degrees

Loosen the rusty bolt at 480-510 degrees

Paint can be removed at 520-550 degrees centigrade

Coke begins to change at 550 degrees centigrade


Safety precautions of hot air duct

1. do not use the hot air blower when the hair dryer

2. do not directly expose the hot air to humans or animals

3. do not use flammable or combustible gas

4. do not block or cover the hot air inlet and outlet

5. when the hot air cylinder is used or just used, do not touch the nozzle. The handle of the hot air dryer must be kept dry

6. the hot air cylinder can be completely cooled before storage

7. working hours may cause a lot of dust, please use the safety mask or dust mask


Operation method

Bending and shaping of 1.PVC plastic pipe:

The tool is very light and easy to operate. Adjustable switch through the temperature, the need to adjust the working temperature. Start by low temperature operation, gradually you want to design the temperature of hot air cylinder attached to the bracket can stand flat or horizontal position vertical (upright), so that you will be setting any material with both hands. In the plug from the socket before please confirm will pull switch control button off

2. removal of paint or decoration:

The air cylinder is opened, by low temperature began to gradually increase to the proper temperature

The hot air to the paint surface removal, after a period of time will soften the paint blisters. Do not let the paint and burned due to overheating, otherwise it will cause difficult to remove. If the strip over the head above the height of paint when you wear goggles

3. when you want to scrape paint, please from top to bottom, with a knife scraping homeopathy. If it is blocked, the scraper beside the light to move the hot air cylinder surface softening. When the paint reaches the temperature of the blister, the paint will be cut as wide as the blade of the blade, even the thicker paint can be removed

4. the scraper should be cleaned regularly, and the scraped paint should be removed before being hardened so as to prevent the paint sticking on the blade. If you must paint scraping shape or the side, in the paint after softening, can scrape with the wire brush

5. make sure that all the treated surfaces are non combustible materials, and that the hot air can not be concentrated on the panel of the window or on the surface of other glass


Maintenance and repair

Do not use a mixture of turpentine, paint, gasoline or the same material cleaning

1. when you stop working, please turn the temperature down slowly, blow out all the hot air in the hot air cylinder, then turn off the switch, and vertical down the hot air cylinder on the flat work table

2. hot air storage cylinder, please confirm the hot air cylinder has been completely cooling

3. frequently clear the air inlet accumulated dirt, and keep the clean air inlet and outlet

4. check all the extension of the insulated wire, if damaged, please immediately change. Do not use the damaged insulation wire, because if the touch may be affected and cause harm

5. all maintenance shall be carried out through authorized service centers or other qualified service organizations to ensure safety and reliability


Related tags:Industrialhotairgun

Previous:no
Next:Tempering hot air gun

Recently Viewed:

视色午夜在线精品一区二区-国产成人无码AV一区二区在线观看-内射丰满高大五十五岁熟女-国产99久久久国产精品~~牛